Your Position Home Production Quality Management

(1) The quality guideline goes through the whole manufacture and management of the factory from incoming material, processing to the after-sale service. The “quality-first” principle must be applied in all the procedures and no disqualified products are allowed to leave the factory.

(2)Promote and carry out overall quality management, establish reliable quality assurance system, improve product quality with good working quality and increasing improvement of procedure quality stability and manufacture more products in line with customers’ requirements.

(3)Ensure the quality of incoming and procured materials, put into production after qualified inspection and control the “incoming” entrance.

(4)Strictly follow technical requirements and operating procedures, ensure product quality and make manufacturing records.

(5)Inspect the materials, semi-finished products and finished products as per regulations, do quality inspection earnestly and be responsible for the date of inspection reports.

 
Tel: 86-757-85234661 85234662
Fax: 86-757-85234660
E-mail: nhlianxing@163.com
Lianxing springs factory Copyright © 2005 - 2019 Lianxing. All rights reserved
Home  |   About LianXing  |   Products  |   Production  |   Network  |   Order  |   Services  |   Contact Us